Overview
A FANUC multi-robot production cell for Unison Ltd, integrating several robots into a single automated line. The cell was built and proven in the UK, then shipped to Ohio, USA, and commissioned on site — so the integration had to be reliable enough to come back to life cleanly thousands of miles from the workshop.
The work covered robot integration, the PLC handshake design that coordinates the robots with the surrounding equipment, safety architecture, and the structured commissioning needed to hand a working line over to a customer overseas.
The brief
Integrate multiple FANUC robots into a coordinated production cell for Unison, build and prove it in the UK, then ship and commission it in Ohio. The cell had to run predictably, recover cleanly from faults, and be supportable by the customer's own team after handover.
Key engineering
With several robots working together, the important engineering is in the coordination: clear handshakes between each robot and the PLC, well-defined ownership of shared zones, and recovery logic so a stop on one station doesn't leave the whole cell in an undefined state.
Because the cell was commissioned overseas, the build was proven thoroughly before it left — the goal was a power-up in Ohio that matched the behaviour signed off in the UK, not a second round of debugging on another continent.
"A cell that has to be commissioned overseas has to be honest about its own state. Clear handshakes and clean recovery are what let it come back to life the same way it left the workshop."
What was delivered
- ✓Integration of multiple FANUC robots into one coordinated cell
- ✓PLC handshake and sequence design across stations
- ✓Safety architecture and zone management
- ✓Build and proving in the UK before shipment
- ✓On-site commissioning and handover in Ohio, USA
The cell running
Project milestones
Cell layout, robot selection, reach and cycle study
Robots, IO, handshakes and safety brought together
Cell run and signed off before shipment
Packed and shipped to Ohio, USA
On-site bring-up to match UK sign-off
Documentation and operator support on site
Gallery
Need a cell built here and commissioned elsewhere?
Start with the process, the robots, and where it has to run on day one.